How to do Asphalt Crack Repair Instructions


FillPro Industries Step By Step Asphalt Repair

FillPro Industries introduces FloMix, the rapid Asphalt repair product. With no saw-cut or demolition required, prep is quick and easy, usually just blown air. Damaged areas can be returned to traffic in a fraction of the time required for traditional repair methods. The polymer-based repair works in areas where there is a lot of movement, damaged base, where heavy rolling equipment is not available or where other asphalt repair materials have failed.

asphalt-repair-1
Each FloMix Kit contains a 1/2 gallon of polymer A, a 1/2 gallon of polymer B, 30 apounds of coated aggregate and 12 pounds of topping sand.

 

asphalt-repair-2
The area to be repaired can be blown clean and dry. No dig-out or removal is necessary. Any tools to be used should be sprayed with release agent.

asphalt-repair-3
If using the Motor Mix Machine, place the empty 5 gallon pail on. If using a drill bit mixer place pail on the ground. Carefully pour in the A side polymer.

asphalt-repair-4
Pour the 30 pounds of specially coated sand into the pail, covering the A side. This will prevent splashing. Mix Sand and Part A for 2 minutes. No reaction will occur until the B side is added.

asphalt-repair-5
Add the B side polymer, place paddle in the pail and mix for 1 minute. The mix is now reactive with an approximate 8-10 minute working time.

asphalt-repair-6
If using optional 25 pounds of 3/8" aggregate, pour rock in slowly and mix for one minute. This will increase volume from 1/3 cubic foot to 1/2 cubic foot per pail.

asphalt-repair-7
Once fully mixed, remove mixing paddle and wipe off with a dry cloth. Do not use water or damp cloth. The mix is now ready for placement.

asphalt-repair-8
Pour the mix directly into affected area and allow to settle to grade. Empty pail completely. Tools can be sprayed with vegetable oil to act as a release agent.

asphalt-repair-9
A hand trowel or squeegee maybe used to feather mix into existing Asphalt. Working time will be 5-8 minutes, (depending on ambient temperature).

asphalt-repair-10
Once feathered to grade you can now broadcast the 12 pounds of polymer coated topping sand to the point of refusal. Use all topping sand.

asphalt-repair-11
The topping sand will create a high traction surface. Clean up with dry cloth, do not use water. Once dry, dispose of bottles and pail in normal manner.

asphalt-repair-12
The area can now be returned to traffic in as little as 10-15 minutes once material has cured. Excess topping sand can be swept away. Catalyst is available for cold weather

Asphalt Repair Video

For Questions Please Call: 1-855-9FillPro (1-855-934-5577)